ESSEX VT-289

NH 033-1(26) Essex

Resurfacing of VT289 ETE MM 7.860 to ETE MM 11.800, including associated ramps and spurs.

Project Location: The project begins at the intersection of VT Route 117 and follows along VT Route 289 to its intersection with VT Route 2A. Also, work under this project will take place on VT Route 2A between the on and off ramps of VT Route 289.

Project Description: Work will consist of coarse-milling the existing pavement to a 2” depth, then placing a 1/2” lift of Type IVS pavement to level the road surface, followed but a 1-1/2” lift of Type IVS pavement as the final wearing surface. Additionally, some guardrail work will be performed to repair and replaced damaged sections to bring full runs into compliance with the current standards. Shoulder berms that have built up will be removed to facilitate better drainage from the road surface, and some ditching work may be performed to further aid in drainage.

The corridor will be evaluated for the installation of Centerline Rumble Strips (CLRS). CLRS will be installed where the speed limit is 45 MPH or greater, the pavement width is 14 feet in both directions, and the traffic volume exceeds 1500 vehicles per day. The CLRS will be stopped at Town Highway intersections, and anywhere that a residence falls within 100 feet of centerline. In these cases, the CLRS will be stopped and resumed 100 feet from either corner of the residence.

Note that this project will be advertised as a composite contract with the Essex-Colchester STP 0207(4) project, which will pave VT Route 2A.


Contact Information

**Please note: Contractors are to direct all inquiries to Contract Administration during project advertisement.

Public Information Consultant
Stephanie Barrett
(802) 862-6868
sbarrett@coibsinc.com

Contact VTrans