GEORGIA-ST. ALBANS TOWN US-7
STP FPAV(40) Georgia
Paving along US 7 from Georgia MM .157 to St Albans Town MM 1.133.
Work to be performed under this project includes milling and resurfacing the existing highway, guardrail improvements, pavement markings, centerline rumble strip installations (CLRS) and other highway related items. This project also includes work to remove a part of an existing traffic island near the Georgia Library which will allow northbound traffic to make lefthand turns into the library entrance.
Project Timeline:
Work will begin in the summer months of 2021 and will conclude in the fall of 2021.
Contact Information
**Please note: Contractors are to direct all inquiries to Contract Administration during project advertisement.
VTrans Project Manager
Brandon Kipp
(802) 224-6110
brandon.kipp@vermont.gov
VTrans Resident Engineer
Christopher Lavalette
(802) 371-9797
chris.lavalette@vermont.gov