NEWBURY BRIDGE BR#15

BO 1447(32) Newbury

Rehabilitation of Bridge No. 15 on TH-3 in Newbury over the Wells River, including replacement of the existing deck and steel beams and minor concrete substructure repair, and approach work.

Project Location: Town of Newbury in Orange County on Boltonville Road (Town Highway 3) over Wells River. The bridge is located approximately 500 feet north of the junction of Boltonville Road and US Route 302.

The Newbury Bridge 15 project includes a superstructure replacement including new bridge joints. The existing structure is a 113-foot long 2-Span Rolled Beam Bridge constructed in 1946. The structure currently has a deck rating of 5 (fair), a superstructure rating of 5 (fair), and a substructure rating of 6 (satisfactory).

VTrans evaluated alternatives for rehabilitation or replacement of the bridge in an engineering study completed in May, 2019. This study assessed the proposed design criteria for the structure, right-of-way, rare/threatened/endangered species impacts, hydraulics, and historic impacts. Several alternatives were considered, including: no action, superstructure replacement, and full bridge replacement. The scoping report evaluated an offsite detour or a temporary bridge for maintenance of traffic.

Given the age of the structure, site constraints and current conditions, the engineering study recommended a superstructure replacement with traffic maintained on an offsite detour for 60 days.  The new superstructure will protect the substructure from further deterioration due to chlorides.  

The bridge will be constructed during the summer of 2021.


Traffic will be maintained on an offsite detour during construction. It is the responsibility of the Town of Newbury to choose and sign the detour. The bridge will be closed from June 12, 2021 to August 18, 2021.        


Link to project sharepoint site: https://outside.vermont.gov/agency/vtrans/external/Projects/Structures/16J179





Closures:

  • Min-0700 will be closed at Bridge BR#15 over WELLS RIVER for 0 days between June 12, 2021 and August 18, 2021.

Contact Information

**Please note: Contractors are to direct all inquiries to Contract Administration during project advertisement.

Public Information Consultant
Natalie Boyle
(802) 855-3893
nboyle@eivtech.com

Contact VTrans