PUTNEY BRIDGE BR#15

STP DECK(38) Putney

REPLACEMENT OF DECK AND MINOR RELATED WORK ON BRIDGE 15 ON US 5 IN PUTNEY OVER SACKETTS BROOK

Project Location: Town of Putney in Windham County on US Route 5 over Sacketts Brook. The bridge is located near the intersection of US Route 5 and Kimball Hill.

The Putney STP DECK(38) project will replace the existing bridge deck, which has non-crash tested bridge and approach rail, with a new bridge deck that meets current design standards. The existing structure is a single span cast-in-place deck on rolled beams constructed in 1954. It is approximately 54 feet in length and 32 feet wide. It features concrete parapets with a metal handrail along with an adjoining sidewalk. The bridge deck is in ‘fair’ condition while the superstructure and substructure are in ‘good’ condition. VTrans bridge inspectors have observed areas of heavy saturation, cracking, and efflorescence in the deck which is evidence of significant concrete deterioration. The bridge is owned and maintained by the State of Vermont.

VTrans evaluated several alternatives to preserve and extend the service life of the Putney US Route 5 Bridge 15 in an engineering study completed in January 2016. The study assessed the proposed design criteria for lane and shoulder widths, safety criteria and historic requirements. Several alternatives were considered including, no action, concrete deck patching and a deck replacement. The study also considered a number of traffic maintenance options such as a short term bridge closure and phased construction. The engineering study recommends replacing the existing bridge deck and bridge approach rails while traffic is maintained on an offsite detour for a 14 day short term road closure. This innovative approach will minimize impacts to right-of-way, utilities and environmental resources as well as minimize traffic disruptions while increasing the safety of the traveling public and construction workers.

The new bridge deck will be constructed using cast in place concrete. The new bridge deck will be the same width, provide a greater load carrying capacity and feature a historic bridge rail that meets safety criteria and ties into the surrounding environment. By applying this cost-effective treatment at the right time, the useful life of the structure will be extended another 30 to 40 years. This provides the largest benefit for the lowest cost when compared to the other bridge treatment alternatives.



Maintenance of Traffic: The bridge is expected to be closed for 14 days, and the traffic will be maintained on an offsite detour shown below. The detour for this project location has an end-to-end distance of 22.30 miles which is approximately 27 minutes. The State of Vermont will be responsible for signing the detour route. The local detours, if any, will be determined and signed by the Town.  

The bridge will be closed all pedestrians for up to 28 days.  A shuttle service for the pedestrians from from one side of the bridge to other side as shown below will be provided by the State in coordination with the Town of Putney.



Bridge Location/Detour Map

Link to project sharepoint site: https://outside.vermont.gov/agency/vtrans/external/Projects/Structures/15b105


Closures:

  • US-5 will be closed at Bridge BR#15 over SACKETTS BROOK for 14 days between July 6, 2020 and July 20, 2020.

Contact Information

**Please note: Contractors are to direct all inquiries to Contract Administration during project advertisement.

Public Information Consultant
Shawna Kitzman
(860) 256-4923
skitzman@fhiplan.com

Contact VTrans

Technical Documents