NEWBURY-RYEGATE I-91N

IM 091-2(98) Newbury

Paving on I91 from Newbury from MM 105.018 to Ryegate MM 115.128 NB including ramps.

Project Location: The project begins on I-91N in Newbury 3.307 miles north of the Bradford/Newbury town line, or approximately 5.1 miles south of the Exit 17 northbound off ramp. The project extends northerly along I-91N for approximately 10.110 miles to MM 115.128 in Ryegate which is approximately 5.0 miles north of the Exit 17 northbound off ramp.

Project Description: Work will consist of some areas of course milling the existing pavement to a 2” depth, then placing a 1/2” lift of Type IVS pavement to level the road surface, followed by a 1-1/2” lift of Type IVS pavement as the final wearing surface, or full width leveling with a 1/2" layer of Type IVS, followed by a 1-1/2” lift of Type IVS as the final wearing surface. Additionally, some guardrail work will be performed to repair and replaced damaged sections to bring full runs into compliance with the current standards. Finally, shoulder berms that have built up will be removed to facilitate better drainage from the road surface.

Project Information Consultant: 

Bethany Oprendek

Bethany@bbo-enterprises.com

802.267.4044 


Contact Information

**Please note: Contractors are to direct all inquiries to Contract Administration during project advertisement.

Public Information Consultant
Bethany Oprendek
(802) 779-7129
bethany@bbo-enterprises.com

Contact VTrans

The Vermont Agency of Transportation is committed to ensuring accessibility and digital accessibility for all. If you need language assistance, reasonable accommodation, or alternative format, please email AOT Factsheet Support.