PLAINFIELD US-2
ER P24-2(610) Plainfield
Slope failure between US 2 and Winooski River MM 0.60-0.70 - D6-US 2 -Plainfield.
Project is located at Milemarker 0.65 on US Route 2 in the Town of Plainfield, just West of the intersection of VT Route 214. Project conists of stabilization of a failing slope, due to the flooding of 2024, between US Route 2 and the Winooski river.
Traffic will be reduced to one (1) lane through the construction site.
Contact Information
**Please note: Contractors are to direct all inquiries to Contract Administration during project advertisement.
Public Information Consultant
Elaine Ezerins
(603) 782-2460
elaine.ezerins@wsp.com