WILLIAMSTOWN VT-64

STP PS26(3) Williamstown

Reclamation on VT 64 in Williamstown from MM 0.578 to 4.223

Project Location: The project begins 300 feet west of the intersection of VT-64 and Amanicki Trail in Williamstown and extends easterly along VT-64 for approximately 3.645 miles to its intersection with VT-14.

Project Description: Work will consist of milling the existing surface to a specified depth, then the first pass reclaim process will occur, pulverizing and homogenizing the remaining pavement with underlying subgrade. New gravel will be placed in some areas along the corridor to improve banking, then a second pass reclaim process will take place which will facilitate a second round of homogenizing of the gravel and pavement as well as add in a stabilizing agent to create a structural layer of subgrade. Following the second pass reclaim, a structural thickness of pavement will be placed, consisting of a combination of cold mix and hot mix asphalt.
Additional work will include the replacement and maintenance of existing guardrail runs, some culvert replacements, ditching and Center Line Rumble Strip installations where criteria have been met. Finally, signs along the corridor will be replaced and upgraded to meet current standards set in the Manual on Uniform Traffic Control Devices (MUTCD).


Contact Information

**Please note: Contractors are to direct all inquiries to Contract Administration during project advertisement.

VTrans Project Manager
Matthew Gamelin
(802) 595-1459
matthew.gamelin@vermont.gov

Contact VTrans

The Vermont Agency of Transportation is committed to ensuring accessibility and digital accessibility for all. If you need language assistance, reasonable accommodation, or alternative format, please email AOT Factsheet Support.