SHELDON-ENOSBURG VT-105
STP FPAV(68) Sheldon
Paving on VT 105 from Sheldon MM 2.003 to Enosburg MM 0.464.
Project Location:
Beginning on VT Route 105 in the Town of Sheldon at MM 2.003 (near the intersection with Mill Street)) and extending easterly along VT Route 105 for a distance of approximately 9.476 miles to MM 0.464 in the Town of Enosburg (near Center Street and Class I Town Highway Limit).
Project Scope:
The primary scope of work is to resurface the highway. This entails milling the roadway to depth of approximately 1-1/2", followed by a thin overlay in the very poor and distressed areas and then an 1-1/2" top surface. The project will also include guardrail maintenance itemsm centerline rumble stripes and some minor activities which will facilitate better drainage off of the existing road surface.
Project Timeline:
The project will begin construction in the spring months of 2025 and will conclude in the fall months of 2025.
Contact Information
**Please note: Contractors are to direct all inquiries to Contract Administration during project advertisement.
Public Information Consultant
Elisabeth Sundberg
(802) 391-5559
esundberg@vhb.com