STOCKBRIDGE-BETHEL VT-107

STP SURF(79) Stockbridge

Paving on VT 107 from Stockbridge Twn MM 0.000 to Bethel Twn MM 3.357.

Project Location: The project begins at the VT Route 107/VT Route 100 intersection in Stockbridge, progresses easterly on VT Route 107 approximately 10 miles to a point near the VT Route 107/VT Route 12 intersection in Bethel. 

Project Description: This project is considered a “preventative maintenance” activity and will be constructed in an effort to keep the condition of the roadway in generally good condition. Work will include fine milling to a depth of 3/4", surface preparation, then paving with a 3/4” layer of bonded wearing course. Additionally, some guardrail work will be performed to repair and replaced damaged sections to bring full runs into compliance with the current standards. Finally, shoulder berms that have built up will be removed to facilitate better drainage from the road surface. 

Project Schedule: This project will begin in the spring months of 2023 and end in the fall months of 2023.


Contact Information

**Please note: Contractors are to direct all inquiries to Contract Administration during project advertisement.

VTrans Project Manager
Brandon Kipp
(802) 224-6110
brandon.kipp@vermont.gov

VTrans Resident Engineer
Thomas Chase
(802) 498-8250
tom.chase@partner.vermont.gov

Contact VTrans