SWANTON-HIGHGATE I-89
IM 089-3(81) Swanton
Mill and Fill on I89 NB&SB from MM 117.960 to MM 130.254 including ramps.
Project Location: Beginning on I-89 in the Town of Swanton, at mile marker 117.960 (just north of Exit 20 in St Albans) and extending northerly for 12.294 miles and ending in the Town of Highgate at mile marker 130.254 (at the country line of Canada and United States). The total project length across both north and southbound lanes is 24.588 miles long.
Project Description: Work will consist of coarse-milling the full existing width of the pavement to a 2” depth, then placing a 1/2” lift of Type IVS pavement to level the road surface, followed by a 1-1/2” lift of Type IVS pavement as the final wearing surface. Additionally, some guardrail work will be performed to repair and replaced damaged sections to bring full runs into compliance with the current standards. Shoulder berms that have built up will be removed to facilitate better drainage from the road surface. Finally, new pavement markings will be installed along with milling of the edge line rumble stripes.
Contact Information
**Please note: Contractors are to direct all inquiries to Contract Administration during project advertisement.
Public Information Consultant
Bethany Oprendek
(802) 267-4044
bethany@bbo-enterprises.com