NORTHFIELD-BERLIN VT-12

STP PS24(1) Northfield

Resurfacing along VT 12 from Northfield mm 4.845 to Berlin mm 6.69. Also includes the Montpelier Jct. State highway, 0.757 mile.

Project Location: 

Northfield-Berlin STP PS24(1): Beginning in Northfield at VT Route 12 at MM 4.844 (near Sherman Ave) and extending northerly along VT Route 12 for a distance of 8.091 miles and ending in Berlin at MM 6.676 at the Montpelier City Highway Limits.

The project also begins on Montpelier Junction State Highway at MM 0.006 (at the intersection of US Route 2) and extends northerly along Montpelier State Highway for a distance of 0.687 miles to MM 0.693. Also includes 0.081 miles of connecting approaches.

Project Scope:

Work to be performed under these projects includes coarse-milling bituminous pavement, resurfacing the existing highway with a leveling and wearing course, pavement markings, guardrail, drainage improvements, signs and other highway related items.  The project also include resurfacing and re-striping of the Montpelier park & ride and will include geometric changes to the intersection of Chandler Hill Road in the Town of Berlin.

Northfield-Berlin STP PS24(1) resurfacing project will be contracted with Montpelier NH PS24(12) resurfacing project which is located on US Route 2.

Project Timeline:

The project will begin construction in the spring months of 2024 and end during the fall months of 2024.


Contact Information

**Please note: Contractors are to direct all inquiries to Contract Administration during project advertisement.

VTrans Project Manager
Brandon Kipp
(802) 224-6110
brandon.kipp@vermont.gov

VTrans Resident Engineer
Paul Perry
(802) 828-2593
paul.perry@vermont.gov