NEWFANE BRIDGE BR#12

BF 0106(6) Newfane

REPLACEMENT OF BRIDGE NO. 12 ON FAS 0106 IN NEWFANE, OVER THE ROCK RIVER.

Project Location: Town of Newfane in Windham County on FAS Route 106 (Depot Road/ TH-2) over the Rock River. The bridge is located approximately 1.9 miles west of the intersection of FAS Route 106 and VT Route 30.


Bridge 12, located along Depot Road over the Rock River in the Town of Newfane, is a historic reinforced concrete closed spandrel elliptical arch, constructed in 1908. The bridge is currently a one lane structure 100-feet long and 18-feet wide. In accordance with Vermont State Design Standards, the bridge is considered narrow with shoulder widths of 3.8-ft and a single lane width of 10-ft. The arch is in poor condition, considered structurally deficient and has a substandard vertical alignment and bridge railing. The subject project will replace the existing arch with a new arch meeting historic requirements.


VTrans evaluated alternatives for replacement of Bridge 12 in an engineering study completed in February 2015. The study assessed the proposed design criteria for the bridge and roadway alignment, Right-of-Way impacts, hydraulics and historic and cultural resources. Several alternatives were considered including no action, rehabilitation of the existing historic arch, full replacement with a new reinforced concrete arch, and full replacement with a prefabricated steel beam bridge with a concrete arch façade to mimic the original structure. Given the age of the structure and structural deficiencies, the engineering study recommended full bridge replacement with an offsite detour.


The new structure will be a functioning reinforced concrete arch similar to the original structure, with a major axis length of 76.5-ft and a minor axis length of 31.0-ft, to match the original bridge profile. This clearspan meets the hydraulic standard of passing the Q50 storm event with at least 1.0-foot of freeboard, and meets bank full width requirements. The new arch will continue to perform as a one-lane bridge via signage and the line striping pattern on the roadway but will be widened to 28-ft to accommodate any potential future two-lane traffic requirements. The lines and concrete details of the original spandrel walls will be replicated as close as possible to the existing characteristics. Additionally, all dimensions and proportions of the original arch will be maintained where possible in the new structure.


It is anticipated that the bridge will be constructed during the summer of 2021. During construction the bridge and Depot Road will be closed and traffic will be detoured via Grimes Hill Road and VT 30. This detour will add approximately 0.5 miles to the through route, and have an end-to-end distance of 4.5 miles. One lane of alternating must be maintained on Grimes Hill Road and Dover Road during construction.



Detour Route: Traffic will be maintained on an off site detour. Detoured traffic will utilize VT30 and Grimes Hill Road during construction. This route will add roughly .5 miles to the through route, for an end-to-end distance of 4.5 miles. Due to site constraints it is anticipated that the detour may need to be reduced to one lane, alternating traffic at the intersection of Depot Road and Grimes Hill Road/ Dover Road at the project site in order to construct the bridge.



Link to project sharepoint site: https://outside.vermont.gov/agency/vtrans/external/Projects/Structures/13j306


Closures:

  • Maj-0106 will be closed at Bridge BR#12 over ROCK RIVER for 180 days between March 14, 2022 and October 14, 2022.

Contact Information

**Please note: Contractors are to direct all inquiries to Contract Administration during project advertisement.

Public Information Consultant
Hannah Brockhaus
(802) 673-1264
hbrockhaus@fhistudio.com

Contact VTrans

Technical Documents