WEST FAIRLEE-THETFORD VT-113
STP CULV(48) West Fairlee
REPLACEMENT OF BRIDGE NO. 24 (48-INCH CGMP) ON VT113, AT THE WEST FAIRLEE- THETFORD TOWN LINE.
The West Fairlee-Thetford STP CULV(48) project consists of the replacement of a 48" metal pipe with a 9-foot wide x 7-foot high x 58-foot long precast concrete box culvert.
Due to constraints and limited spatial requirements for construction, the project will utilize a 48-hour closure period for installation of the box culvert. Detour will utilize VT Routes 110, 14, and US Route 5 to access VT Route 113.
Contact Information
**Please note: Contractors are to direct all inquiries to Contract Administration during project advertisement.
Public Information Consultant
Delia Makhetha
(603) 851-8561
delia.makhetha@wsp.com