MORGAN VT-111

STP CULV(46) Morgan

REPLACEMENT OF BRIDGE NO. 10 (60-INCH CGMP) ON VT111 IN MORGAN.

Culvert Rehabilitation Project to include replacement of an existing 60" corrugated metal pipe with a new 7' x 14' Pre-Cast Concrete Box Culvert. Design to include significant excavation of a deep embankment with an anticipated 60-Day Full Road Closure and designated detour along VT Route 105. Also will require aerial utility relocations.