MONTPELIER US-2

NH PC24(2) Montpelier

Class 1 paving in Montpelier on US 2 from mm 1.758 to mm 4.414 and on N9390 from mm .854-.89.

Project Location: The project begins near the Bailey Ave intersection on US Route 2 and progresses easterly for a distance of 2.701 miles to the Berlin/Montpelier townline.  

Project Description: Work will consist of coarse milling the existing pavement to a 2” depth, then placing a 1/2” lift of Type IVS pavement to level the road surface, followed by a 1-1/2” lift of Type IVS pavement as the final wearing surface. Sidewalk ramps and pedestrian crossing infrastructure will be replaced and upgraded to meet current ADA standards as necessary. Some bicycle features may be added where applicable and feasible. Signs will also be replaced and upgraded as necessary to meet current specifications in the Manual on Uniform Traffic Control Devices (MUTCD).  The existing traffic signal systems will receive various equipment upgrades. Finally, shoulder berms that have built up will be removed to facilitate better drainage from the road surface, and some ditching work may be performed to further aid in drainage.  This project will also be constructed with the Montpelier STP PC24(3) resurfacing project on US Route 2 and US Route 302 which begins near the Graves Street intersection and progresses easterly to Bailey Ave/Memorial Drive intersection. and begins at the US Route 302/US Route 2 roundabout and ends at the Berlin/Montpelier Townline.  

Project Timeline:  At this time, the project is planned to begin construction during the spring months of 2023 and conclude during the fall months of 2023.


Contact Information

**Please note: Contractors are to direct all inquiries to Contract Administration during project advertisement.

Public Information Consultant
Delia Makhetha
(603) 263-8881
delia.makhetha@wsp.com

Contact VTrans